مشروع البحث: THE RELATIONSHIP BETWEEN TECHNOLOGICAL, ORGANIZATIONAL, AND ENVIRONMENTAL FACTORS AND BUILDING INFORMATION MODELING ADOPTION IN THE LIBYAN CONSTRUCTION SECTOR: THE MODERATING ROLE OF CORPORATE CULTURE
| dc.contributor.advisor | Assist. Prof. Dr. Akram ALHAMAD | |
| dc.date.accessioned | 2026-06-14T07:36:31Z | |
| dc.date.available | 2026-06-14T07:36:31Z | |
| dc.description | The study is also limited methodologically. It adopts a quantitative cross-sectional design, which means that the data were collected at one point in time and therefore do not capture how BIM adoption may evolve across different stages of organizational change or institutional development. In addition, the study is based on self-reported questionnaire responses, which means that the empirical evidence reflects informed respondent perceptions rather than audited organizational records or direct observation of BIM practice. | |
| dc.description.abstract | This study examines the relationships between technological, organizational, and environmental factors and Building Information Modeling adoption in the Libyan construction sector. The study is grounded in Technology, Organization, and Environment framework and Institutional Theory, and it investigates the extent to which Complexity, Relative Advantages, Compatibility, Top Management Support, Organizational Readiness, Mimetic Pressures, Coercive Pressures, and Normative Pressures are statistically associated with organizational BIM adoption. In addition, Corporate Culture is examined as a moderating variable in the relationship between Normative Pressures and BIM adoption. | |
| dc.identifier | 1331 | |
| dc.identifier.uri | https://dspace.academy.edu.ly/handle/123456789/2289 | |
| dc.subject | THE RELATIONSHIP BETWEEN TECHNOLOGICAL, ORGANIZATIONAL, | |
| dc.title | THE RELATIONSHIP BETWEEN TECHNOLOGICAL, ORGANIZATIONAL, AND ENVIRONMENTAL FACTORS AND BUILDING INFORMATION MODELING ADOPTION IN THE LIBYAN CONSTRUCTION SECTOR: THE MODERATING ROLE OF CORPORATE CULTURE | |
| dspace.entity.type | Project | |
| project.endDate | 2026 | |
| project.funder.name | إدارة الاعمال | |
| project.investigator | إسماعيل محمد منصور هيلان | |
| project.startDate | 2025 |
