مشروع البحث:
Development of Pavement Maintenance Management System (PMMS) of Airports Case study (RW 11/29 Mitiga International Airport

dc.contributor.advisorالمبروك, صابر
dc.date.accessioned2025-03-13T08:30:51Z
dc.date.available2025-03-13T08:30:51Z
dc.descriptionThe airport network is one of the major assets that make up the most important investments in most of the world. Airport docks remain the main element in the airport infrastructure. The safety of the aircraft landing depends heavily on the characteristics of the pavement surface It is noted that the sidewalks of the runway are increasing in the collapse of many of the ‎reasons and most important to increase the loads and the frequency of the climate as well as ‎the absence of a special administration runs the work of paving and keep pace with the ‎development in this area and if occurred maintenance work in a random and unsought of ‎cost, effort and time.‎ Finally, this study aims at finding a methodology to maintain these platforms by ‎implementing the correct maintenance in a timely manner and at the lowest cost by using ‎APMS systems These systems support the correct decisions with a regular approach that ‎helps airport managers and engineers enable them to obtain accurate information and the ‎optimal strategies needed to manage their berths well and effectively thereby determining ‎maintenance costs and priorities.‎ The assessment of the 11/29 Metiga airport was carried out at the international airport after ‎it was divided into 5 parts and the adoption of the status of the pier (PCI). Using the Micro ‎Paver program, which is one of the most important programs used in pavement ‎management? ‎ ‎It is easy to use and contains all the possible damage to paving. It is one of the most ‎widespread programs and is used to evaluate the flexible and solid paving of both roads and ‎airports.‎ This pavement status indicator is rated from 0 to 100, where 0 is the worst possible case and ‎‎100 is the best excellent case.‎ The results of the study were as follows: the lowest value was (38 - very poor) and the ‎highest value (59 - Fair)‎ The other three parts were (50, 52, and 53 - poor) due to the repeated loads and shelf life ‎and lack of maintenance periodically.‎
dc.description.abstractThe airport network is one of the major assets that make up the most important investments in most of the world. Airport docks remain the main element in the airport infrastructure. The safety of the aircraft landing depends heavily on the characteristics of the pavement surface It is noted that the sidewalks of the runway are increasing in the collapse of many of the ‎reasons and most important to increase the loads and the frequency of the climate as well as ‎the absence of a special administration runs the work of paving and keep pace with the ‎development in this area and if occurred maintenance work in a random and unsought of ‎cost, effort and time.‎ Finally, this study aims at finding a methodology to maintain these platforms by ‎implementing the correct maintenance in a timely manner and at the lowest cost by using ‎APMS systems These systems support the correct decisions with a regular approach that ‎helps airport managers and engineers enable them to obtain accurate information and the ‎optimal strategies needed to manage their berths well and effectively thereby determining ‎maintenance costs and priorities.‎ The assessment of the 11/29 Metiga airport was carried out at the international airport after ‎it was divided into 5 parts and the adoption of the status of the pier (PCI). Using the Micro ‎Paver program, which is one of the most important programs used in pavement ‎management? ‎ ‎It is easy to use and contains all the possible damage to paving. It is one of the most ‎widespread programs and is used to evaluate the flexible and solid paving of both roads and ‎airports.‎ This pavement status indicator is rated from 0 to 100, where 0 is the worst possible case and ‎‎100 is the best excellent case.‎ The results of the study were as follows: the lowest value was (38 - very poor) and the ‎highest value (59 - Fair)‎ The other three parts were (50, 52, and 53 - poor) due to the repeated loads and shelf life ‎and lack of maintenance periodically.‎
dc.identifier7032
dc.identifier.urihttps://dspace.academy.edu.ly/handle/123456789/1489
dc.subjectDevelopment of Pavement Maintenance Management System (PMMS) of Airports Case study (RW 11/29 Mitiga International Airport
dc.titleDevelopment of Pavement Maintenance Management System (PMMS) of Airports Case study (RW 11/29 Mitiga International Airport
dspace.entity.typeProject
project.endDate2019
project.funder.nameإدارة المشاريع الهندسية
project.investigatorيوسف محمد المكي
project.startDate2018
relation.isOrgUnitOfProject71420d0a-5d78-4408-b831-76d08947b613
relation.isOrgUnitOfProject.latestForDiscovery71420d0a-5d78-4408-b831-76d08947b613
relation.isPersonOfProject4503c772-4171-4c1a-9e5c-19feefb2be27
relation.isPersonOfProject.latestForDiscovery4503c772-4171-4c1a-9e5c-19feefb2be27
الملفات
الحزمة الأصلية
يظهر اﻵن 1 - 1 من 1
لا توجد صورة مصغرة متاحة
اﻻسم:
‎ Yousef Mohamed Elmaki ‎.pdf
الحجم:
4.89 MB
التنسيق:
Adobe Portable Document Format
حزمة الترخيص
يظهر اﻵن 1 - 1 من 1
لا توجد صورة مصغرة متاحة
اﻻسم:
license.txt
الحجم:
1.71 KB
التنسيق:
Item-specific license agreed to upon submission
الوصف: