Modelling interaction between schedule performance and schedule determinants of construction projects

dc.contributor.advisorد. فرانسيس ايدوم فوتوي
dc.contributor.advisorد.روبي سويتانتو
dc.contributor.advisorالبروفسور أندرو برايس
dc.date.accessioned2024-12-10T08:18:08Z
dc.date.available2024-12-10T08:18:08Z
dc.descriptionConstruction performance continues to be hindered within the industry, and many projects still experience poor schedule performance. Consequently, numerous studies have been conducted globally to investigate the causes of poor schedule performance in construction projects. However, most studies have approached project schedule performance from a negative perspective. In contrast, this study adopts a neutral perspective to avoid bias. Furthermore, unlike most studies that focus on a single country, this research examines three countries to determine both local and global factors that influence schedule performance. The study investigates the interactions between schedule performance and schedule determinants in construction projects. Data from 191 projects in Libya, Ghana, and Saudi Arabia were collected using a questionnaire to determine the dominant determinants of schedule performance. Data were analysed using SPSS, and several statistical analyses,
dc.description.abstractConstruction performance continues to be hindered within the industry, and many projects still experience poor schedule performance. Consequently, numerous studies have been conducted globally to investigate the causes of poor schedule performance in construction projects. However, most studies have approached project schedule performance from a negative perspective. In contrast, this study adopts a neutral perspective to avoid bias. Furthermore, unlike most studies that focus on a single country, this research examines three countries to determine both local and global factors that influence schedule performance. The study investigates the interactions between schedule performance and schedule determinants in construction projects. Data from 191 projects in Libya, Ghana, and Saudi Arabia were collected using a questionnaire to determine the dominant determinants of schedule performance. Data were analysed using SPSS, and several statistical analyses,
dc.identifier171
dc.identifier.urihttps://dspace.academy.edu.ly/handle/123456789/731
dc.subjectModelling interaction between schedule performance and schedule determinants of construction projects
dc.titleModelling interaction between schedule performance and schedule determinants of construction projects
dspace.entity.typeProject
project.endDate2023
project.funder.nameمشاريع البناء
project.investigatorطاهر محمد
project.startDate2022
الملفات
الحزمة الأصلية
يظهر اﻵن 1 - 1 من 1
لا توجد صورة مصغرة متاحة
اﻻسم:
Thesis.pdf
الحجم:
4.73 MB
التنسيق:
Adobe Portable Document Format
حزمة الترخيص
يظهر اﻵن 1 - 1 من 1
لا توجد صورة مصغرة متاحة
اﻻسم:
license.txt
الحجم:
1.71 KB
التنسيق:
Item-specific license agreed to upon submission
الوصف: